
english > products > rubber dam > rubber dam application range-九游会ag登录
>
rubber dam application range
hydropower
rubber dam can increase the reservoir capacity, increase the reservoir water flow gap, thereby increasing the amount of electricity.

shengzhou boat lake water conservancy project (4.08m * 70m * 3 span)
recharge groundwater
rubber dam can cut into the haikou river, increase the upper reaches of the water level, increase the amount of groundwater recharge.

shandong yantai back to the rubber dam project (5m * 160m)
rain and sewage diversion
rubber dam can divert the river, so as to maintain the ecological water, to avoid water pollution.

stop salty light
rubber dam can be built in the sea, the river's fresh water resources play a protective role.

city view
rubber dam can lift the upper reaches of the water level, forming a large area of gentle water, rich urban landscape.

liaoning gaizhou shimen drift project (1.5m * 70m * 2 span)
hydropower
rubber dam can increase the reservoir capacity, increase the reservoir water flow gap, thereby increasing the amount of electricity.

shengzhou boat lake water conservancy project (4.08m * 70m * 3 span)
recharge groundwater
rubber dam can cut into the haikou river, increase the upper reaches of the water level, increase the amount of groundwater recharge.

shandong yantai back to the rubber dam project (5m * 160m)
rain and sewage diversion
rubber dam can divert the river, so as to maintain the ecological water, to avoid water pollution.

stop salty light
rubber dam can be built in the sea, the river's fresh water resources play a protective role.

city view
rubber dam can lift the upper reaches of the water level, forming a large area of gentle water, rich urban landscape.

liaoning gaizhou shimen drift project (1.5m * 70m * 2 span)